Why the planner never shows an expected value

Ranking decisions by expected value needs a probability over what is true. A model's band has none, so the planner solves the budget three times instead.

AnantCausal, Engineering · · 6 min read

Reviewed by Team Anant

Every budget tool eventually prints one number per option and ranks by it. That number is usually an expected value, and it hides an assumption most people never see: that someone supplied a probability for every possible outcome. When the inputs are a causal model's effect bands, nobody did. This post explains why the AnantCausal planner refuses to print that number, and what it shows instead.

What is an expected value, and why does every budget tool print one?

An expected value is an average of outcomes, each weighted by how likely it is. A lottery ticket that pays 100 with one chance in ten and nothing otherwise has an expected value of 10. The calculation is only as good as the odds you feed it.

Budget tools like it because it turns a messy set of options into a ranked list. A finance team can sort by it, cut at the budget line, and move on. The ranking looks objective. The trouble starts when the odds were never measured.

What does a causal model's band actually tell you?

A model estimates that an action changes an outcome by some amount. It also reports a band: the range that estimate moves across when each probability table in the model is shifted by its plausible margin. That is a sensitivity envelope.

The band says the effect stayed between a low and a high figure. It does not say where inside the range the truth is more likely to sit. Is the middle ten times as likely as the edges, or equally likely? The model cannot tell you, because it never measured that.

A business example: three retention programs and a budget

Suppose a subscription software company has 100 thousand dollars to spend on retention this year and three candidate programs. The numbers below are invented to show the mechanism. They are not from any real company.

ProgramCostValue at low endValue at point estimateValue at high end
Win-back emails4551530
Loyalty discount607090110
Onboarding calls501060120

Values are retained annual revenue in thousands of dollars, taken from each program's effect band. The budget is 100, so the loyalty discount (60) cannot be bought together with either other program, but win-back emails and onboarding calls fit together (95).

An expected-value tool would pick a point in each band, usually the middle, and rank. The planner instead funds the budget three times.

  1. At the low end of every band

    The loyalty discount returns 70. Win-back plus onboarding returns only 15. Fund the loyalty discount.

  2. At the point estimate

    The loyalty discount returns 90, against 75 for the other pair. Fund the loyalty discount.

  3. At the high end of every band

    Now win-back plus onboarding returns 150, against 110 for the loyalty discount. The answer flips.

No program is funded in all three solves, and that is the useful result. The decision turns on one thing: how good onboarding calls really are. A single expected-value number would have picked the loyalty discount and never mentioned that the choice sat on a knife edge.

What do you do when the answer flips?

A flipped answer is not a failure of the planner. It is the planner telling you where your uncertainty is expensive.

In the example, the model's own band for onboarding calls is wide, from 10 to 120. Narrowing it is worth far more than refining the loyalty discount, whose band is tight. The sensible move is a small experiment on onboarding calls, not a larger committee meeting.

Funded in all three solvesFunded in some of them
Holds up under the model's worst caseDepends on the model being better than its worst case
Safe to commit nowWorth buying evidence on before committing
Little value in more analysisA cheap test may change the decision

The platform pairs this with a ranking of where more evidence would matter most, which needs no probability either. It asks which uncertain parts of a model, if known better, could change the funded set.

Why not just assume the middle of the band is most likely?

Because sometimes it is not, and the model cannot say when. If the band comes from shifting a probability table by a fixed margin, the middle is simply the unshifted table. Nothing about the evidence makes the unshifted table more likely than its neighbors.

There is a second reason that is about people rather than mathematics. A ranked list with decimals invites debate about the decimals. A three-column answer with a flip in it invites debate about the assumption, which is the debate worth having.

What this does not tell you

The example numbers are invented. They show how a funded set can change across a band, not how often it does in practice.

What to do next

Ask the people presenting any ranked budget list one question: where did the probabilities come from? If the answer is that the middle of a range was assumed, you have a different decision to make than the list suggests.

Read how this fits the rest of the portfolio view, and how a band is produced in refutation and sensitivity.

Frequently asked questions

What is an expected value in a budget decision?
It is a probability-weighted average of the outcomes a decision could have. If an action could return 20 or 120 with stated odds for each, the expected value weights them by those odds. Without the odds there is nothing to weight by.
Is a sensitivity band the same as a confidence interval?
No. A confidence interval comes from sampling error in data. A sensitivity band is how far an answer moves when the inputs it rests on are shifted across their plausible range. It has no probability distribution inside it, so you cannot average over it.
What should I do when the funded set changes between the low end and the high end?
Treat the change as the finding. It says the budget answer depends on a specific assumption, so the next dollar is better spent on evidence about that assumption, such as a small experiment, than on committing the whole budget.
Can a planner still be useful without an expected value?
Yes. Solving at the low end, the point value and the high end tells you which choices hold under the model's worst case, which depend on its best case, and where more evidence would change the answer.

Keep reading

  • identification · measurement

    The naive comparison said the discount hurt

    In the worked example, a naive comparison says a retention discount raises churn. Adjusting for tenure reverses the sign. Both figures are computed.

    · 5 min read